CoatingPassport · schema v1.1Demo · Harbor quay

DEMO-QUAY-K3 — Coating Passport

Combined topside-handheld + diver underwater hovedinspeksjon of a 280 m container quay (built 1982, 13 m draft). Sheet-pile splash-zone section loss at 42% drives structural reassessment. Longitudinal deck crack 2.4 mm × 35 m above NS-EN 1992-1 marine-exposure threshold. Pier-cap delamination signals corroding rebar.

Asset

Asset ID
DEMO-QUAY-K3
Type
Harbor quay
Material
mixed
Operator
Demo Port Authority
Inspection cycle
6-yearly hovedinspeksjon

Inspection

Timestamp
Tue, 12 May 2026 08:30:00 GMT
Footage source
handheld
Duration
180 min
Frames analyzed
324,000
Operator tier
enterprise_user
Model version
hullproof-vlm-v2.1.3

Findings summary (4)

0
critical
2
severe
1
moderate
1
minor

Findings detail

crack

confidence 89%412 framesimg-quality 83%severe

Longitudinal crack 2.4 mm width, 35 m length on quay deck. Above NS-EN 1992-1 immediate-review threshold (>1 mm in XS3 marine exposure).

Location: Quay deck, midpoint, longitudinal crack (145, 0, 0)
Recommended action: Crack injection per NS-EN 1504 within 60 days; investigate substructure for differential settlement causes.

corrosion

confidence 93%287 framesimg-quality 86%severe

Steel sheet-pile section loss estimated 42% in splash zone, 6 m length. Approaching structural-reassessment threshold.

Location: Sheet pile, splash zone, K3-S22 to K3-S28 (220, -3, -4)
Recommended action: Engineering critical assessment for load-bearing capacity; plan cathodic-protection upgrade + clad-welding restoration within 12 months.

delamination

confidence 82%198 framesimg-quality 78%moderate

Concrete delamination 6.8 m² on bullnose sector 3. Audible thumping; consistent with corroding reinforcement.

Location: Concrete bullnose, sector 3 (95, 0, -2)
Recommended action: Patch repair scoping per NS-EN 1504; cover-meter survey to assess rebar condition.

marine growth

confidence 78%412 framesimg-quality 74%minor

Mussel + barnacle growth 35-45 mm thickness on underwater sheet-pile. Within tolerance for inspection access.

Location: Underwater sheet-pile, full length (0, 0, -8)
Recommended action: No action this cycle; document for trending.

Compliance

EU AI Act class
high_risk_ai_system
Review workflow
Pending

Applicable standards

  • PIANC WG 145 (Berthing velocities and fender design)
  • BS 6349 (Maritime works)
  • EAU 2012 (Recommendations of the Committee for Waterfront Structures)
  • NS-EN 1992-1 (Eurocode 2 — Concrete structures)
  • Kystverket Standard for kaikonstruksjoner

Interoperability

Cognite CDF compatible
Yes
OSDU mapping
Veracity export
Not exported
Knowledge graph
Not generated

The same JSON powers Cognite CDF Asset+Timeseries, OSDU exports, RDF knowledge graphs, and MCP-tool calls from agentic systems. PDF is a renderer of this; never the source.

Demo passport generated from fixtures/passports/demo-harbor-quay-001.ts. Production passports are built by the analysis pipeline via buildCoatingPassport() and validated against the Zod schema at src/lib/passport/types.ts.